万博ManbetxAPP(中国)股份有限公司-SouG百科

Development History

  • 1972

    The first 18kW wind turbine in China, abreakthrough in medium-sized wind turbine in China.

  • 1997

    200kWwind turbine , the state-level scientific achievement.

  • 1999

    250kWwind turbine, the earliest wind turbine put into commercial use in China.

  • 2003

    WD49-750wind turbine, by Repower technology, over 500 units installed, availabilityover 97%. in operation for over 6 years.

  • 2006

    Getthe order of national authorized project in Danjinghe, Hebei province.

  • 2008

    WD1.5MWseries, the first wind turbine using latest load optimization controltechnology in China, was developed and put into batch production.

  • 2010

    ZheinagWndey Co., Ltd. is established through the shareholding reform.

    Windeybecomes the executor of State Key Laboratory of Wind Power System.

    2.5MW prototype completed.

  • 2011

    First Award for Scientific and Technology Progress in Zhejiangprovince.

    Selected as the Working Station for Academicians.

  • 2012

    1.5MWpast Low Voltage Ride Through Test by China Electrical Power Research Institute.

    Zhejiang key Laboratory of Wind Power System was completed.

  • 2013

    The first wind turbine exported to Iran succeeded in trial run.

    The post-doctoral working station starts.

  • 2014

    Special Award of China Mechanical Science was granted to Windeyfor the project “High-power Wind Turbine Development and Demonstration”.

  • 2015

    The registered trade mark was nominated as the Provincial FamousTrade Mark.

    The research institute under Windey’s administration was honoredas the “Key Research Institute of Zhejiantg Province”.

    The State Key Laboratory of Wind Power System was and approved bythe Ministry of Science.

  • 2016

    The company was awarded the title "2016 Zhejiang Top 100 High-tech Enterprises".

    WINDEY passed the first domestic WTGS PFMA(primary frequency modulation ability) test.

    WINDEY 2MW WTGS was conferred the title "Quality Products Made in Zhejiang" of 2016

  • 2017

    2MW WTGS was accredited as "The First Product in Zhejiang Province"

    The Zhejiang Strategic Alliance for Wind Power Industry Technology Innovation led by WINDEY successfully passed the acceptance.

    WINDEY's "Corporate Technology Center" was continuously rated as provincial-level excellent corporate technology center.

    The "Academician and Expert Workstation" was rated as provincial-level excellent academician and expert workstation.

    "WINDEY Zhejiang International Science and Technology Cooperation Base" was officially approved to be established.

    WINDEY fulfilled a "zero" breakthrough in international patents

    The commencement ceremony of WINDEY Xiyang Gaoluo Wind Farm Phase I took place.

    WINDEY won the first prize of Zhejiang Science and Technology Award for Machinery Industry in 2017

  • 2018

    WINDEY was awarded the title "Technological Innovation Demonstration Enterprise in Zhejiang Province"

    The first steel-concrete tower with a hub height of 120 meters was successfully hoisted

    WINDEY won the "First Prize of Zhejiang Science and Technology Award" again.

    WINDEY 3MW platform prototype was successfully connected to the grid

    The first WTGS of WINDEY4.XMW platform was successfully launched

  • 2019

    WINDEY was successfully listed on A-share market.

    WINDEY won the First Prize of Shanghai Science and Technology Progress Award for the first time.

    The roll-out ceremony for the first WTGS of WINDEY Harbin Wind Power Industry Equipment Base was successfully held

    WINDEY WD4500 WTGS successfully rolled off the production line

    WINDEY won “China Machinery Industry Science and Technology Award”

  • 2020

    WD2500 WTGS was conferred the title"Quality Products Made in Zhejiang" in 2019

    WINDEY 4.5MW prototype was successfully hoisted

    The world’s first 4.5MW three-level 1140V squirrel cage full power WTGS was successfully connected to the grid.

    WINDEY won the Excellent Prize of China Patent Award

    WINDEY won the first prize of Beijing Science and Technology Award

    The first WTGS of Vietnam Ninh Thuan Chinh Thang 50MW wind power project was hoisted

    WINDEY's first wind power project was connected to the grid for power generation

  • 2021

    Won the Quality Award of Zhejiang Provincial People's Government

    Won the Second Prize of National Science and Technology Progress Award

    Elected as the convenor of the IEC International Standards Working Group (JWG25)

    Launched the world's highest (170 meters) truss-type WTGS

    Put the wind farm with the world’s highest altitude (5158m) into production in Tibet

    The main structure of the Ulanqab Intelligent Industrial Park was completed

    Won the honor “CGN’s Five-star Supplier” again

    Completed the first grant of the Restricted Stock Incentive Plan

    Conferred the title "Zhejiang Leader in Per-mu Benefits"

  • 2022

    Successfully selected as a state-level "Green Factory"

    The Technology Center was recognized as the National Corporate Technology Center

    Successfully selected as a pilot enterprise of “Future Factory in Zhejiang Province” in 2022

    Won the highest rating "A" for information disclosure of listed companies in Shenzhen Stock Exchange

    Won the “2021 Zhejiang Science and Technology Progress Award”

    The opening ceremony of “Wenzhou Dongtou High-end Energy Storage Equipment Manufacturing and Demonstration Application Integration Project” was successfully held

    The roll-out and production ceremony of the first WTGS of Northern Headquarters (Ulanqab) Intelligent Industrial Base was successfully held

    Won the title “Outstanding Unit in Incorruptibility Construction in Zhejiang Province”

  • 2023

    The Company was officially renamed as WINDEY Energy Technology Group Co., Ltd.

    Windey officially joined the United Nations Global Compact.

    WINDEY’s first 13MW-class onshore WTGS full-power test platform in China was put into use.

    Windey makes Chinese wind turbines stand in Serbia for the first time.

    WINDEY Chuxiong Intelligent Manufacturing Base was put into production, or its first large-megawatt WTGS rolled off the production line.

    The first large-megawatt WTGS of WINDEY Yongzhou Base rolled off the production line.

    WINDEY (Wenzhou) Smart Energy Storage Production Base was officially put into production.

    The world's first 180-meter ultra-high-performance concrete material mixing tower WTGS was hoisted.

    WINDEY continuously won the highest rating “A” for information disclosure of listed companies on the Growth Enterprise Market of Shenzhen Stock Exchange.

    WINDEY, on behalf of China’s complete wind power enterprises, achieved export of technologies and standards for the first time.

    WINDEY 16-18MW floating offshore WTGS, as the world’s largest one, rolled off the production line.

    WINDEY was included into the list of state-level "Science and Technology Reform Enterprises".

    10MW onshore WTGS with the world’s largest diameter for wind wheel and the largest power for single generator set was connected to the grid.

    WINDEY offshore wind power project with the largest scale for single project and the largest capacity for single generator set in Zhejiang Province was delivered in full capacity.

    The world's first-ever "One Machine, One Storage" solution was applied in batch, improving the WTGS’s grid friendliness.

    Joined hands with Ningbo Zhoushan Port, the world's largest port, to build "Zero-carbon Port for Integration of Wind, PV, and Storage".